Golden Hill Lane

Rubber processing had resulted in elevated metal and hydrocarbon concentrations in soils presenting a potential risk to an adjacent water course. Made ground was excavated, with hand picking to remove deleterious materials, asbestos and waste rubber. Stockpiles were then tested against remedial criteria. Solidification / stabilisation was applied to 6,500m3 of failing materials to reduce contaminant leachability. Over 50 tonnes of soils with >0.1% asbestos were disposed off site, and over 660 tonnes of rubber and deleterious materials. This approach implemented the technical stages of the Consultants remediation design, which was completed by the installation of a cover sequences.